The English Block
All the Rooms Painted
Carpet on the first floor!
Vinyl on the ground floor!
The Main Entrance
We made some improvements to the front entrance to the school two years ago. The longer term plan is to build out and create a more welcoming space, however, in the short term phase two of the project is to refresh the reception. This low cost solution is aimed at creating a more open plan feel.
The Main Hall
The floor has been cleared ready to strip back the surface and then for it to be sealed and polished.
The RE Rooms!
Having had a major issue with one of the walls between the rooms, work is now back on track. The wall had to be partially removed, rebuilt and plastered before the teaching wall could go up. However, the outcome looks very impressive.