Music Suite
Mr Drake's classroom has been emptied and decorated. New flooring is being put down before the next stage of the transformation can be completed. Watch the blog to find out how this
work progresses.
Additional Teaching Walls
Rooms 7, 8 and 9 are being restructured to include new white teaching walls. However, there is a lot of work to do to ensure that old pipework and sinks are removed, as the rooms were once used for art lessons.Refurbishing English Classrooms
Each of the rooms in the English Block are being refurbished. The walls are being painted, floors replaced with new carpet tiles upstairs and vinyl on the ground floor. The aim is to give a fresh, light feel to each room, ready for it to become the Year 7 Centre in September. This is a very big job as this involves at least 10 rooms.The boys toilets are also being completely refurbished.The Main Entrance
The aim is to give a bright new look to this area of the school!